Heat Pump Service in Cupertino
Heat Pump Installation and Repair in Cupertino, CA
Heat pump installation, replacement and repair, ducted or ductless, for Cupertino homeowners from our shop in San Jose. This page covers the local side: the City's heat pump permit package and sound worksheet, where the outdoor unit may sit, Title 24 checks on a changeout, ductless options and the conditions of SVCE's heat pump rebate.
- Google 4.9130+ reviews
- Licensed C-36 · C-20 · ACSLB License #1101278
- 1-year labor warranty24/7 service since 1986

Heat Pump Services for Cupertino Homes
- Heat pump installation and repairDucted systems, sizing, service
- Ductless mini-splitsSingle and multi-zone
- Heat pump water heatersEfficient electric hot water
- Duct repair and replacementLeaky or undersized ducts
- HVAC rebatesPrograms for heat pumps and more
- Federal tax creditWhat qualifies and how to claim
Heat Pumps in Cupertino: What's Different
Cupertino has its own checklist for heat pump permits, and it checks each outdoor unit against the noise code before work starts.
Heat pumps aren't instant permits
The City's instant online permits don't include heat pumps. They take a standard permit, which can be issued over the counter, or within 2 to 3 business days by email, once the package is complete.
A sound worksheet for every unit
The permit includes the City's Sound Rating Worksheet, filled in with the exact unit, its rated sound level and its distance to the property lines, to show it meets Municipal Code chapter 10.48.
68°F, three feet up
The City's heat pump handout asks for a floor plan showing that the conditioned space will reach at least 68°F at three feet, citing California Residential Code R325.8.
Setbacks of an accessory structure
Zoning treats heating and cooling equipment like an accessory structure for setbacks. In R-1 zones, detached accessory structures stay 3 feet from rear and interior side lines and 20 feet from the front.
SVCE rebate, no AC needed
Silicon Valley Clean Energy's heat pump rebate covers ducted and ductless systems that replace a gas furnace or electric resistance heat. Existing air conditioning isn't required; approval comes first.
Charge verified on every heat pump
Under the 2025 Energy Code, a heat pump's refrigerant charge is verified in every climate zone, and swapping either half of a split system triggers duct sealing and testing.
A Homeowner’s Guide to Heat Pump Installation and Repair in Cupertino
The City’s permit package for a heat pump
Cupertino’s Building Division has a handout written just for heat pumps. It cites Municipal Code section 16.04.050, which requires a permit to install or replace a heat pump HVAC system. Heat pumps aren’t among the instant online permits, so plan on a standard permit with four pieces:
- Application for the permit.
- Product specifications for every indoor and outdoor unit, showing installation clearances and decibel ratings.
- Floor plan and site plan marking each unit, the main electrical panel’s size and location, and each outdoor unit’s distance to the property lines. The City uses the floor plan to confirm the heated space reaches 68°F at three feet, and the panel size to judge whether the service can take the new load.
- Sound Rating Worksheet, filled in from those same details.
Complete packages can be issued over the counter to the owner or a licensed contractor, or emailed to permitcenter@cupertino.gov for issue in 2 to 3 business days. Inspection questions go to buildinginspectors@cupertino.gov.
Where the outdoor unit can sit
A heat pump’s outdoor unit runs through winter, often overnight, so its location matters more than a summer-only condenser’s. Chapter 10.48 holds a residential property to 60 dBA in daytime and 50 dBA at night at the receiving property. Night starts at 8 p.m. on weekdays and 6 p.m. on weekends and runs until 7 a.m. on weekdays and 9 a.m. on weekends. The worksheet tests your unit’s rating and setback against those limits before a permit issues.
Zoning sends heating and cooling equipment to the accessory structure setbacks in section 19.100.030. For detached accessory structures in R-1 zones, that table lists 3 feet from rear and interior side lines, 15 feet from a corner lot’s street side and 20 feet from the front; confirm with Planning which line applies to your lot. Rooftop units aren’t allowed in R1-e zones such as Fairgrove’s Eichler tract, and hillside (RHS) lots must ground-mount and screen equipment.
Title 24 on a heat pump changeout
California’s 2025 Energy Code, as the Energy Commission explains it, sets these checks when a heat pump goes in:
- Refrigerant charge is verified for heat pumps in every climate zone.
- Ducts are sealed and tested whenever the system is altered, even if only the indoor or outdoor unit is replaced. An ECC-Rater confirms 10% total leakage or 7% to outside, or a smoke test showing accessible ducts are sealed.
- Load calculations are required for new systems.
- Refrigerant recovery from the old system is done by a technician with an EPA 608 Type II or Universal certificate.
See duct repair if testing finds leaks.
Ductless mini-splits
Homes without ducts, rooms the ducts don’t reach and additions are where a ductless mini-split fits: one outdoor unit serving one or more indoor heads. The Energy Commission treats it like any other system: a permit, a load calculation and charge verification, including for pre-charged DIY kits. In Cupertino its outdoor unit goes on the same site plan and sound worksheet as a ducted one. A plug-in room heat pump needs no Energy Code efficiency rating, only the state and federal appliance standards; used as the home’s main heat, it must still be sized to the Building Code. See mini-splits.
SVCE rebates and panel capacity
Silicon Valley Clean Energy, Cupertino’s community energy provider, offers a heat pump HVAC rebate for replacing a gas furnace or electric resistance heater. Its April 2026 specifications require an inverter heat pump or SEER2 16 or better, accept ducted and ductless systems, exclude single-stage and dual-fuel systems, and require proof of permit. Apply before installing; reservations hold for 120 days, and SVCE has a contact for emergency replacements. Income-qualified customers apply separately for higher rebates.
SVCE also offers a prewiring rebate for a space heating circuit and, with a core appliance like a heat pump, an electrical service upgrade add-on for panel work up to 100 amps, or up to 200 amps by exception with the contractor’s load calculation. Panel work is done by a licensed electrician. See SVCE heat pump rebates.
All-electric rules and the furnace rule
Cupertino required all-electric new construction from 2020, then suspended enforcement of Municipal Code chapter 16.32 as of May 15, 2024, after a Ninth Circuit decision. A newer energy-efficiency code for new buildings, approved by the City Council in September 2024, also targets new construction, so replacing a working gas furnace with a heat pump stays your choice. The Bay Area Air District’s Rule 9-4 sets a zero-NOx standard for furnaces manufactured from January 1, 2029. The federal 25C credit ended for installs after 2025; see federal tax credit.
Sources
City of Cupertino: Instant Permits (Residential Only) · Building Division FAQ · Forms, Handouts and Fee Schedules · Permitting Requirements for Heat Pumps · Residential Electrical Load Calculation · All-Electric Building · Municipal Code, ch. 10.48 and §§ 19.28.110, 19.40.060, 19.100.030. Silicon Valley Clean Energy: Home Rebates · Appliance Specifications (April 2026). California Energy Commission: 2025 Single-Family HVAC. Bay Area Air District: Building Appliances Rule Implementation. TECH Clean California incentives. Checked October 2026.
Certified technicians. Danny (Plumbing Superintendent), Luis (Plumbing Superintendent), Antonio (Senior Plumbing Technician), Dustin (Senior Plumbing Technician) and Joel (Senior Plumbing Technician) are Rheem heat pump certified.Meet the team
Heat Pump Prices in Cupertino
Most repairs are quoted as a fixed price before we start, so you approve the cost before any work begins. These are typical prices for common jobs in our service area.
| Service | Typical price (USD) |
|---|---|
| Ducted heat pump system | $8,000–$25,000 |
| Heat pump with new air handler | $12,000–$22,700 |
| Dual-fuel system (heat pump + furnace) | $10,000–$20,000 |
| Ductless mini-split, single zone | $3,000–$8,000 |
| Ductless mini-split, multi-zone | $9,000–$15,000 |
| Inspection feeWaived for service plan members | $59 |
Prices are installed, before any current special, and depend on access, materials and what we find.
A Cupertino heat pump goes through a standard permit with equipment specifications, a floor and site plan and the Sound Rating Worksheet, plus ECC-Rater duct and refrigerant charge checks, so leaky ducts are sealed before the final. If the panel lacks capacity, the electrician's panel upgrade is its own permit; a same-location panel up to 200 amps can use the instant permit.
Get a free estimate →Our new heat pump system has just been installed and we are very pleased with CPI and the new equipment. We are especially grateful for the knowledgeable and hard-working technician Bunhak, who worked throughout our recent heatwave to finish the job. We would highly recommend CPI for any HVAC installation or maintenance.
Linda G.Google review
CPI Service is a great company to use for HVAC too! Our A/C stopped working during the recent heatwave & another company wanted to replace our whole unit. Then we called CPI & they found it didn’t need to be replaced, they fixed it that day! I really appreciate a company that responds quickly, is very professional & reasonably priced!!! I’ll be using them for sure in the future.
Jaycee V.Google review
Prompt response, polite, knowledgeable. Good at explaining options and following through until solved.
Pauline M.Google review
Current Specials
Save on your visit. Mention the offer when you book.
- Any Plumbing Service$50 OFFGet Offer: Any Plumbing ServiceLimit 1 per household. Cannot be combined with other offers. Expires January 15, 2028. See details for Any Plumbing Service
- Sewer Line InspectionFREECamera inspectionGet Offer: Sewer Line InspectionLimit 1 per household. Cannot be combined with other offers. Expires January 15, 2028. See details for Sewer Line Inspection
- Water Heater Installation$250 OFFGet Offer: Water Heater InstallationLimit 1 per household. Cannot be combined with other offers. Expires January 15, 2028. See details for Water Heater Installation
- Second OpinionFREEAlready have a quote from another licensed plumber?Get Offer: Second OpinionFor customers with a quote from another licensed plumber. Expires January 15, 2028. See details for Second Opinion
- 12-Month Financing0%Interest for 12 monthsGet Offer: 12-Month FinancingThrough Synchrony, subject to financing approval. Expires January 15, 2028. See details for 12-Month Financing
- Seniors, Teachers & Healthcare Workers5% OFFSeniors 65+, teachers and healthcare workersGet Offer: Seniors, Teachers & Healthcare WorkersFor seniors 65+, teachers and healthcare workers. Expires January 15, 2028. See details for Seniors, Teachers & Healthcare Workers
Heat Pump Service in Cupertino FAQs
Do I need a permit to install a heat pump in Cupertino?
Yes. The City's heat pump handout cites Municipal Code section 16.04.050 for both heat pump HVAC systems and heat pump water heaters. Heat pumps aren't on the instant permit list, so the job takes a standard permit. Submit the application, product specifications with clearances and decibel ratings, a floor plan and site plan, and the Sound Rating Worksheet. A complete package can be issued over the counter to the owner or a licensed contractor, or emailed to permitcenter@cupertino.gov for issue within 2 to 3 business days. See heat pump installation.
How does the City decide whether my heat pump is too loud?
Through the Sound Rating Worksheet. You enter the unit to be installed, its sound rating and its setback from each property line, and the City uses it to check the unit against chapter 10.48 before issuing the permit. That chapter caps a residential property at 60 dBA by day and 50 dBA at night at the receiving property. A heat pump also runs on winter nights, so the 50 dBA limit is usually the one that decides placement.
Will a heat pump need a bigger electrical panel?
Not always. The City asks for the main panel's size and location on the plans so it can check whether the existing service can carry the new load, and its residential load calculation form has a line for the largest heating or cooling load. If the panel falls short, panel work is done by a licensed electrician; a same-location upgrade up to 200 amps at a home outside an HOA can use the City's instant permit.
What does SVCE require for its heat pump rebate?
The heat pump must replace a gas furnace or an electric resistance heater at a single-family home, ADU, mobile home or building of up to four units, not new construction. SVCE's April 2026 specifications require an inverter heat pump, or SEER2 16 (SEER 17) or better; single-stage units and dual-fuel systems don't qualify, the gas furnace should be removed, and proof of permit is required. Apply before installing; a reservation holds for up to 120 days. See SVCE heat pump rebates.
Can a ductless mini-split heat part of my house?
Yes. SVCE's rebate rules accept ductless mini-splits as well as ducted systems. The California Energy Commission says a mini-split needs a building permit and a load calculation, and that even a pre-charged DIY kit gets refrigerant charge verification because its line set is connected on site. In Cupertino the outdoor unit still goes through the sound worksheet and setback check. See ductless mini-splits.
Is there still a federal tax credit for heat pumps?
No, not for new installs. The federal 25C credit ended for equipment placed in service after December 31, 2025; a system installed in 2025 is claimed on that year's return with IRS Form 5695. State programs are tapped out as well: TECH Clean California's single-family heat pump incentives have been fully reserved since November 14, 2025, and HEEHRA single-family rebates since February 24, 2026, with new requests waitlisted. See federal tax credit.
How much does heat pump installation and repair cost in Cupertino?
Most jobs are quoted as a fixed price before we start, so you know the cost up front. Typical prices: ducted heat pump system $8,000–$25,000; heat pump with new air handler $12,000–$22,700; dual-fuel system (heat pump + furnace) $10,000–$20,000; ductless mini-split, single zone $3,000–$8,000; ductless mini-split, multi-zone $9,000–$15,000. The inspection fee is $59, waived for service plan members.
Need a heat pump in Cupertino? Call us.
- CSLB License #1101278 (opens CSLB in a new tab): C-36 Plumbing · C-20 HVAC · A General Engineering
- 1-year labor warranty on our work
- BBB A+ Accredited Business (opens BBB in a new tab)
- Technicians trained and certified: NASSCO PACP, MACP and LACP · Rheem heat pump · Noritz Level 3 tankless · OSHA safety
- Member of IAPMO, NASSCO, BOMA, IFMA · Se habla español